San Jose Flea Market, Outfall Structure Replacement (Lake or Streambed Alteration Agreement No. 1600-2017-0257-R3)

4 Documents in Project

Summary

SCH Number
2005042070
Lead Agency
City of San Jose
Document Title
San Jose Flea Market, Outfall Structure Replacement (Lake or Streambed Alteration Agreement No. 1600-2017-0257-R3)
Document Type
NOD - Notice of Determination
Received
Posted
9/18/2017
Present Land Use
Flea Market / A(PD) Planned Development Zoning District for commercial uses (100 ac), IP - Industrial Park Zoning District (20 ac), and A - Agriculture Zoning District (0.3 ac) / Combined Industrial/Commercial (31 ac); Transit Corridor Residential (20+ cu/ac) (58.5 ac); Medium Density Residential (8-16 du/ac) (8 ac); Public Park/Open Space (22.8 ac along creeks); with Floating Park designation along north edge of site.
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0257-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, The San Jose Flea Market, Inc. Project includes replacement of an existing outfall structure. The existing 48-inch pipe will be replaced by a 54-inch pipe. The existing 354 sq. ft. of sackrete will be replaced with rip rap. An additional 104 sq. ft. of rip rap will be placed where landscape does not currently exist.

Contact Information

Name
Kristin Garrison
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
San Jose
Counties
Santa Clara
Cross Streets
Both sides of Berryessa Road, north of Mabury Road
Total Acres
120.3
Parcel #
241-03-020; 241-04-006 and 007, 254-17-007, 052, 053, 084, and 095
State Highways
87, 101, 680, 880
Railways
LRT, UPRR
Schools
Berryessa USD, East Side Union HSD
Waterways
Coyote and Penitencia Creeks

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print