Neenach Pumping Station Turnout Facility

3 Documents in Project

Summary

SCH Number
2005041169
Lead Agency
Los Angeles, City of (City of Los Angeles)
Document Title
Neenach Pumping Station Turnout Facility
Document Type
NOD - Notice of Determination
Received

Document Description
LADWP is proposing to construct and operate the Neenach Pumping Station Turnout Facility to allow direct deliveries of raw water from the California Aqueduct to Los Angeles via the First Los Angeles Aqueduct (FLAA) to make up for reduced withdrawals from the eastern Sierras as well as to enhance existing system reliability by permitting an alternative means of making deliveries into the LADWP system. DWR must separately approve the delivery of non-State Water Project (SWP) water to the proposed turnout. Once the source of any non-SWP water LADWP plans to procure is identified, that transaction will be evaluated for compliance with CEQA as a separate Project.

Contact Information
Craig Trombly
Department of Water Resources
1416 Ninth Street
Sacramento, CA 95814

(916) 653-6250

Location

Cities
Lancaster
Counties
Los Angeles
Cross Streets
Three Points Road / Avenue C
Zip
93536
Total Acres
1.5
State Highways
138
Waterways
California Aqueduct
Township
8N
Range
16W
Section
16
Other Location Info
Elizabeth Lake

Notice of Determination

Approving Agency
Department of Water Resources
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
Department of Water Resources 1416 9th Street, Room 338 Sacramento, CA AND Los Angeles Department of Water and Power 111 N. Hope Street Los Angeles, CA 90012

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search