Phase I Upper Mojave River Well Field
13 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2005041103
- Lead Agency
- Mojave Water Agency
- Document Title
- Phase I Upper Mojave River Well Field
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 2/10/2010
- Document Description
- The applicant proposes to construct a new groundwater recharge, conveyance, extraction facilities and the operation of existing facilities to provide for import, banking and return of banked groundwater. A proposed conveyance pipeline crosses five drainages (the Oro Grande Wash and unnamed tributaries to the Mojave River). The pipeline will be installed by open trench utilizing a 20 ft construction easement. The pipeline will be either a ductile iron pipe or steel pipe. Either type would be installed with native backfill and cement mortar lined and coated. Approximately 562 cy of fill material will be cut and backfilled at the Oro Grande Wash. THe area will be excavated, the pipeline will be installed, and a concrete encasement will be utilized at the bottom of the ditch to allow for ~15 ft of scour.
- Contact Information
-
Eric Weiss
California Department of Fish and Game
Lead/Public Agency
407 West Line Street
Bishop, CA 93514
Phone : (760) 246-8828
Location
- Cities
- Apple Valley Hesperia Victorville
- Counties
- San Bernardino
- Regions
- Unincorporated
- Cross Streets
- Numerous - Primary are State Highway 18 and Interstate 15
- Zip
- 92307
- Total Acres
- 10
- Parcel #
- Multiple
- State Highways
- 247, 18, 395, 58, I-15, I-40
- Railways
- AT&SF
- Airports
- Hesperia Airport & SCLA
- Schools
- Yes
- Waterways
- Mojave River
Notice of Determination
- Approving Agency
- DFG
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- DFG 407 West Line St Bishop, CA 93514
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- N/A
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.