Class III Hazardous Waste Facility Permit Modification for the Chemical Waste Management, Kettleman Hills B-18 Landfill Expansion Project (the Project)

9 Documents in Project

Summary

SCH Number
2005041064
Lead Agency
Kings County
Document Title
Class III Hazardous Waste Facility Permit Modification for the Chemical Waste Management, Kettleman Hills B-18 Landfill Expansion Project (the Project)
Document Type
NOD - Notice of Determination
Received

Document Description
The Project is DTSC's approval of the B-18 Hazardous Waste Facility landfill expansion permit modification under Chapter 6.5 of the California Health and Safety Code, section 25200, and Title 22 of the California Code of Regulations, section 66270.42, The Department of Toxic Substances Control (DTSC) considered the Addendum and Initial Study/Environmental Checklist (Addendum) for the B-18/B-20 Hazardous Waste Disposal Project, Kettleman Hills Facility Final Subsequent Environmental Impact Report (FSEIR) due to the changes proposed for the engineering plans for the B-18 landfill expansion area. DTSC determined that the Addendum prepared is appropriate pursuant to Cal. Code Regs., tit. 14, 15164.

Contact Information
Wayne Lorentzen
Department of Toxic Substances Control
8800 Cal Center Drive
Sacramento, CA 95826

916-255-3883

Location

Coordinates
35°58'15.315"N 120°0'54.082"W
Cities
Kettleman
Counties
Kings
Cross Streets
35251 Old Skyline Road
Zip
92239
Total Acres
474
Parcel #
038-310-005, -320-021, 015, 020, -330-001, 019, 020
State Highways
SR 41
Railways
No
Airports
No
Schools
No
Waterways
No
Township
22,23S
Range
3,34
Section
18E
Base
MDB&M
Other Information
Range: 33

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
DTSC Hazardous Waste Management Program, 8800 Cal Center Drive, Sacramento, CA 95826

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search