Santa Anita Park Specific Plan

7 Documents in Project

Summary

SCH Number
2005031131
Lead Agency
City of Arcadia
Document Title
Santa Anita Park Specific Plan
Document Type
NOD - Notice of Determination
Received
Posted
5/3/2007
Present Land Use
R-1, S-1, and C-28D
Document Description
The Shops at Anita Park Specific Plan development encompasses the following development for the 304-acre Project Site: (1) an 806,405-square foot commercial, retail, and office center, arranged as a new pedestrian-oriented Main Street, to be constructed on the southern parking lot of the property; (2) relocation of the existing Saddling Barn and demolition of the south ticket gates; (3) a 1.4-acre landscaped open space area linking the existing Paddock Gardens with the proposed new commercial, retail, and office center; (4) a 3.5-acre water feature located within a 7.5-acre landscaped open space area at the southern end of the property; (5) improvements to vehicle and pedestrian access, parking, infrastructure, and other ancillary facilities throughout the property, as well as off site, to support the development, which will result in the demolition of four structures in the stable area; and (6) a new wireless electric trolley traveling on fixed rails between the expanded Paddock Gardens at the north end of Main Street and the water feature and promenade at the south end of Main Street.

Contact Information

Name
Jason Kruckeberg
Agency Name
City of Arcadia
Contact Types
Lead/Public Agency

Location

Cities
Arcadia
Counties
Los Angeles
Cross Streets
285 W. Huntington Drive, roughly between Baldwin Ave, Huntington Dr and Colorado Place
Zip
91066-6021
Total Acres
304
Parcel #
5775-001-021, Bk17, Pg13, Parcel A
State Highways
I-210, SR-19
Railways
Metro Gold Line ROW
Waterways
Arcadia, Santa Anita, and Sierra Madre Washes; MWD Upper Feeder
Township
1N
Range
11W
Section
Unname
Base
Mt Wilso

Notice of Determination

Approving Agency
City of Arcadia
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print