Amendment to the Adopted Airport Land Use Compatibility Plan ("ALUCP") for Ramona Airport
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2005031109
- Lead Agency
- San Diego County Regional Airport Authority
- Document Title
- Amendment to the Adopted Airport Land Use Compatibility Plan ("ALUCP") for Ramona Airport
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/10/2008
- Present Land Use
- Public / Semi-Public Lands / Specific Plan / Residential
- Document Description
- The Airport Authority determined it was necessary to amend the adopted Ramona Airport ALUCP after discovering that the location of the single runway at Ramona Airport, the airport influence area (AIA) and the underlying factors/layers were incorrectly depicted on the maps in the adopted ALUCP. The amended ALUCP, which is the subject on this Notice of Determination, contains revised maps; no other changes to the adopted ALUCP have been made. The revised maps reflect the actual location of the runway, AIA, and underlying factors/layers which are approximately 500 feet west of the location depicted on the maps adopted in 2006.
- Contact Information
-
Keith Wilschetz
San Diego County Regional Airport Authority
Lead/Public Agency
Airport Land Use Commission P.O. Box 82776
San Diego, CA 92138-2776
Phone : (619) 400-2461
Location
- Counties
- San Diego
- Regions
- Unincorporated
- Cross Streets
- Montecito Road / SR-67
- Zip
- 92065
- Total Acres
- 378
- State Highways
- 67
- Airports
- Ramona
- Other Location Info
- City/Nearest Community: Ramona
Notice of Determination
- Approving Agency
- San Diego County Regional Airport Authority
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- San Diego County Regional Airport Authority 3225 North Harbor Drive, 3rd Floor San Diego, CA
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.