Amendment to the Airport Land Use Compatibility Plan (ALUCP) for the Borrego Valley Airport

4 Documents in Project

Summary

SCH Number
2005031078
Lead Agency
San Diego County Regional Airport Authority
Document Title
Amendment to the Airport Land Use Compatibility Plan (ALUCP) for the Borrego Valley Airport
Document Type
NOD - Notice of Determination
Received
Posted
12/7/2011
Present Land Use
Public / Semi-Public Lands / Multiple Rural Use
Document Description
The project amended certain provisions of the ALUCP adopted for the Airport in December 2006. As a general matter, the ALUCP provides land use compatibility policies and criteria for the area surrounding the Airport. The basic function of the ALUCP is to promote compatibility between the Airport and the land uses that surround the Airport and, as such, the ALUCP includes specified limitations and conditions on the future development of new land uses surrounding the Airport. The amendments to the ALUCP include clarifications ot the safety matrix along with modifications to existing policies regarding non-conforming structures, calculating maximum use of a site, new uses in existing structures, ALUC review for certain projects, and threshold of change for ALUC review.

Contact Information

Name
Keith Wilschetz
Agency Name
San Diego County Regional Airport Authority
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
County Highway S22 / Borrego Valley Road
Zip
92004
Total Acres
200
State Highways
Various
Airports
Borrego Valley
Other Location Info
City/Nearest Community: Borrego Springs

Notice of Determination

Approving Agency
San Diego County Regional Airport Authority
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print