Tally Road Water Storage Tank
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2005031053
- Lead Agency
- Eastern Municipal Water District
- Document Title
- Tally Road Water Storage Tank
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 5/23/2005
- Present Land Use
- Medium Density Residential
- Document Description
- The proposed project consists of the construction of a 1.5 million gallon water storage tank including site drainage facilities, access road, and supply pipeline within the Antelope Pressure Zone to provide water storage capacity for the new homes presently being constructed in the area. The purpose of the water storage tank will be to provide adequate fire flow for fire hydrants, provide adequate capacity to meet the established maximum day demand that would, for example, occur during the hottest summer day, and to provide adequate emergency capacity should electric power be interrupted. The current water storage and distribution system within the Antelope Pressure Zone does not have the capacity to meet those provisions for the new homes presently being constructed in the surrounding area.
- Contact Information
-
Karen Hackett
Eastern Municipal Water District
Lead/Public Agency
2270 Trumble Road P.O. Box 8300
Perris, CA 92572-8300
Phone : (951) 928-3777 x4462
Location
- Counties
- Riverside
- Cross Streets
- Tally Road / Tate Road
- State Highways
- 215
- Schools
- Menifee ES
- Waterways
- Salt Creek
- Township
- 5S
- Range
- 3W
- Section
- 27
- Base
- SBBM
- Other Location Info
- Sun City
Notice of Determination
- Approving Agency
- Eastern Municipal Water District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Eastern Municipal Water District
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.