State Route 74 / Ortega Highway Safety Improvements (EA 043200)

3 Documents in Project

Summary

SCH Number
2005031040
Lead Agency
California Department of Transportation, District 12
Document Title
State Route 74 / Ortega Highway Safety Improvements (EA 043200)
Document Type
NOD - Notice of Determination
Received
Posted
11/22/2005
Present Land Use
Open Space
Document Description
Caltrans proposes to implement a safety improvement project on SR 74 in Orange County. Improvements would occur within an approximately 3-mile stretch of the Ortega Highway from San Juan Canyon Bridge to the Riverside County Line. Existing 3 meter (10-11 foot) lanes would be widened to the standard lane width of 3.4 meters (12 feet), 1.2 meter (4 foot) shoulders would be added, improvements would be made to drainage, and intermittent turnout/rock catchment areas would be added. The proposed project is located within the Santa Ana Mountains, on the south end of San Juan Canyon, and entirely within the Cleveland National Forest. The existing and future land use designation for the project area is open space/recreation.

Contact Information

Name
Praveen Gupta
Agency Name
California Department of Transportation
Contact Types
Lead/Public Agency

Location

Cities
San Juan Capistrano
Counties
Orange
Cross Streets
SR 74 / San Juan Cyn Bridge-Orange / Riverside County Line
Zip
92530
Total Acres
28
Parcel #
N/A - In Cleveland National Forest
State Highways
SR 74
Waterways
San Juan Creek
Township
7S
Range
6W
Section
2
Base
Sitton P
Other Location Info
Lake Elsinore
Other Information
Base: Sitton Peak

Notice of Determination

Approving Agency
California Department of Transportation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print