Lake Perris Pollution Prevention and Source Program

4 Documents in Project

Summary

SCH Number
2005031010
Lead Agency
Metropolitan Water District of Southern California
Document Title
Lake Perris Pollution Prevention and Source Program
Document Type
NOD - Notice of Determination
Received
Posted
8/1/2006
Present Land Use
Present land use-reservoir/recreation; GP designation - public facilities, open space-water, conservation-habitat, open space-recreation
Document Description
The Lake Perris Program consists of two projects to improve water quality and ensure access to stored water at Lake Perris, an element of State Water Project, near Riverside. The two projects are: (1) Dissolved Oxygen Enhancement Project and (2) Pathogen Reduction Project. The objective of these projects is to expand the ability to withdraw water for drinking water purposes utilizing the full range of lake depths. The Dissolved Oxygen Enhancement Project is necessary because there is considerably less flexibility to withdraw good quality water during the summer due to the low dissolved oxygen levels. The proposed aeration system using pure oxygen will increase the availability of good quality water and ensure that a backup supply to the Skinner and Mills service area is maintained. Completion of plans and specifications for the dissolved oxygen system will enable progress to be made to ensure access to Lake Perris supplies. The Pathogen Reduction Project will investigate the need and, if warranted, design water quality improvements that would reduce the risks of pathogens associated with body contact recreation at the reservoir.

Contact Information

Name
Delaine W. Shane
Agency Name
Metropolitan Water District of Southern California
Contact Types
Lead/Public Agency

Location

Cities
Moreno Valley, Perris
Counties
Riverside
Cross Streets
Ramona Expressway and Lake Perris Drive; Ramona Expressway and Rider Street
Zip
92571
Parcel #
Various
Schools
Rancho Verde HS, Lakeside MS
Waterways
Water Body: Lake Perris
Township
3S
Range
3W
Section
10,34,
Base
SBBM
Other Information
Section: 35

Notice of Determination

Approving Agency
Board of Directors of the Metropolitan Water District of Souther
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print