City of Stockton Regional Wastewater Control Facility Utility Crossing

6 Documents in Project

Summary

SCH Number
2005022067
Lead Agency
City of Stockton
Document Title
City of Stockton Regional Wastewater Control Facility Utility Crossing
Document Type
NOD - Notice of Determination
Received
Posted
6/10/2005
Present Land Use
Public Lands / Industrial Z: PL - Public Lands District / IG - Industrial General GP: Institutional / Industrial
Document Description
City of Stockton operates its Regional Wastewater Control Facility (FWCF) on 690 acres south of the Port of Stockton and Rough and Ready Island. The main plant facilities are on the east side of the San Joaquin River, and a series of treatment ponds and process units for tertiary wastewater treatment are on the west side of the river. Because the San Joaquin River separates the main plant from the ponds and tertiary units, access, and coordinated operations are limited. The proposed utility crossing will connect facilities on the east and west sides at approximately River Mile 41. The crossing will increase efficiency by providing an access route between the main and tertiary plants for light truck traffic and wiring.

Contact Information

Name
David Stagnaro
Agency Name
City of Stockton
Contact Types
Lead/Public Agency

Location

Cities
Stockton
Counties
San Joaquin
Cross Streets
Daggett Road
Parcel #
162-140-01, 11; 163-330-03
State Highways
Hwy 4
Railways
BNSF RR
Airports
N/A
Waterways
San Joaquin River
Township
1N
Range
6E
Section
16

Notice of Determination

Approving Agency
City of Stockton
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print