Magpie Creek Diversion Channel Enhancement Project

3 Documents in Project

Summary

SCH Number
2005022061
Lead Agency
Sacramento Area Flood Control Agency
Document Title
Magpie Creek Diversion Channel Enhancement Project
Document Type
NOD - Notice of Determination
Received
Posted
6/2/2005
Present Land Use
Flood Control, Open Space, and Habitat Conservation Area
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2004-0126-R2 pursuant to Section 1602 of the Fish and Game Code to the project applicant, Sacramento Area Flood Control Agency. SAFCA proposes to improve the functions and values of wildlife habitat along a portion of MCDC; diversify the stream's geomorphic configuration (i.e., meanders, riffles, pools); increase stream and floodplain interaction; improve bank and slope stability; and reduce maintenance needs.

Contact Information

Name
Gary L. Hobgood
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
Dry Creek Road / Ascot Avenue
Zip
95838
State Highways
I-80
Railways
N/A
Airports
Rio Linda
Schools
Rio Linda Junior and High Schools
Waterways
Rio Linda Creek, Robla Creek, Dry Creek
Township
9N
Range
5E
Section
10
Base
Diablo

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print