LOGP to Stubble Field 6 Inch Gas Pipeline Abandonment

3 Documents in Project

Summary

SCH Number
2005021095
Lead Agency
Santa Barbara County
Document Title
LOGP to Stubble Field 6 Inch Gas Pipeline Abandonment
Document Type
NOD - Notice of Determination
Received
Posted
7/8/2005
Present Land Use
Agricultural
Document Description
Decommission of the Lompoc Oil and Gas Plant (LOGP) to Stubblefield Valve site 6 inch gas pipeline through a combination of abandonment in place and removal. The pipeline was originally constructed in 1952 and transported gas from the LOGP to the now decommissioned and removed Battles Gas Plant. The pipeline extends for a linear distance of approximately 11.5 miles and traverses 11 creeks and 2 drainages. From south to north the pipeline right-of-way crosses the following assessor parcel numbers: 097-360-010 (PXP), 099-010-049 (Betteravia Farms), 099-010-029 (Betteravia Farms), 101-080-071 (Betteravia Farms), 01-080-050 (Betteravia Farms), 101-080-070 (Beringer), 101-080-069 (Beringer), 101-080-47 (Betteravia Farms), 101-080-91 (Betteravia Farms), 101-080-89 (Beringer), 101-020-074 (PXP), 101-020-041 (PXP), 101-020-040 (PXP), 101-010-007 (PXP), 101-010-013 (McCadden).

Contact Information

Name
Dean Dusette
Agency Name
Santa Barbara County
Contact Types
Lead/Public Agency

Location

Cities
Lompoc
Counties
Santa Barbara
Cross Streets
3602 Harris Grade Road
Zip
93436
Parcel #
097-360-010
State Highways
1
Waterways
San Antonio Creek, Pine Canyon Creek, various washes

Notice of Determination

Approving Agency
Deputy Director of Planning & Development Energy Division
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.