Post Creek Culvert Replacement

Summary

SCH Number
2005018086
Public Agency
California Department of Parks and Recreation
Document Title
Post Creek Culvert Replacement
Document Type
NOE - Notice of Exemption
Received
Posted
1/5/2005
Document Description
Replace two culverts at a single road crossing of Post Creek in Pfeiffer Big Sur State Park with one box culvert with a natural channel bottom and associated with wing walls. Remove existing culverts and backfill from the channel. New construction will be faced with rock matching existing rockwork to the extent feasible. To avoid disturbing juvenile steelhead trout, project activities will not be started before late summer.

Contact Information

Name
Jill Poudrette
Agency Name
California Department of Parks and Recreation
Contact Types
Lead/Public Agency

Location

Counties
Monterey

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Class 2; Sec 15302
Reasons for Exemption
Project consists of the repair and alteration of an existing deteriorated structure supporting a public road; maintenance of a stream channel to protect fish and wildlife resources; and alterations to structural and topographical features involving no expansion of use beyond current levels.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print