Galindo Creek Trail Gap Closure Project (PN 283)
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2005012103
- Lead Agency
- City of Concord
- Document Title
- Galindo Creek Trail Gap Closure Project (PN 283)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/5/2008
- Present Land Use
- N/A to the road right of way. A portion of the project is located in an area of open space designated as Low Density Residential.
- Document Description
- This project will construct a 600 ft. long, 8 ft. wide unpaved trail between existing trail located on the east side of Galindo Creek and install a prefabricated bridge crossing Galindo Creek. The trail will be located approx. 25 ft. from the top of the creek bank to minimize impacts. The project also includes constructing bank stabilization and minor drainage improvements along a 100 ft. section of Ygnacio Valley Rd.
- Contact Information
-
Michelle Jesperson
State Coastal Conservancy
Lead/Public Agency
1330 Broadway, 13th Floor
Oakland, CA 94612
Phone : (510) 286-7148
Location
- Cities
- Concord
- Counties
- Contra Costa
- Cross Streets
- North side of Ygnacio Valley Road / West of Alberta Way
- Zip
- 94519
- Total Acres
- 0.2
- Parcel #
- 133-141-010, 014
- State Highways
- N/A
- Railways
- N/A
- Airports
- N/A
- Schools
- CSU-Hayward, Clayton Valley HS
- Waterways
- Galindo Creek
- Township
- 1N
- Range
- 1E
- Section
- Rancho
- Base
- Clayton
Notice of Determination
- Approving Agency
- State Coastal Conservancy
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- State Coastal Conservancy 1339 Broadway, 13th Floor Oakland, CA 94612
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.