Maintenance and Operation of the Los Vaqueros Project including the new Alternative Intake Project 2081-2009-013-03

13 Documents in Project

Summary

SCH Number
2005012101
Lead Agency
Contra Costa Water District
Document Title
Maintenance and Operation of the Los Vaqueros Project including the new Alternative Intake Project 2081-2009-013-03
Document Type
NOD - Notice of Determination
Received
Posted
3/26/2010
Document Description
Contra Costa Water District (CCWD) currently operates and maintains the Los Vaqueros Project (LVP) which includes a dam and reservoir in the Kellogg watershed in eastern Contra Costa County and three existing intakes and pumping systems: Mallard Slough, Rock Slough, and Old River. CCWD is constructing a new intake, the Alternative Intake Project (AIP), at a site along the lower third of Victoria Canal (in the south-central part of the Delta). The AIP will include a state-of-the-art fish screen, pumping plant, and an associated pipeline across Victoria Island connecting the new intake to the existing Old River conveyance system on Byron Tract.

Contact Information

Name
Leah Orloff
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Brentwood
Counties
Contra Costa, San Joaquin
Parcel #
Numerous
State Highways
4
Schools
Discovery Bay Elementary
Waterways
Old River, N. Victoria Canal, Victoria Canal, Middle River, Italian Slough
Other Location Info
Victoria Island and Byron Tract

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print