Maintenance and Operation of the Los Vaqueros Project including the new Alternative Intake Project 2081-2009-013-03
13 Documents in Project
Summary
SCH Number
2005012101
Lead Agency
Contra Costa Water District
Document Title
Maintenance and Operation of the Los Vaqueros Project including the new Alternative Intake Project 2081-2009-013-03
Document Type
NOD - Notice of Determination
Received
Posted
11/9/2009
Present Land Use
General Agriculture and Open Space, Resource Conservation
Document Description
Contra Costa Water District (CCWD) currently operates and maintains the Los Vaqueros Project (LVP) which includes a dam and reservoir in the Kellogg watershed in eastern Contra Costa County and three existing intakes and pumping systems: Mallard Slough, Rock Slough, and Old River. CCWD is constructing a new intake, the Alternative Intake Project (AIP), at a site along the lower third of Victoria Canal (in the south-central part of the Delta). The AIP will include a state-of-the-art fish screen, pumping plant, and an associated pipeline across Victoria Island connecting the new intake to the existing Old River conveyance system on Byron Tract.
Contact Information
Name
Chuck Armor
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Brentwood
Counties
Contra Costa, San Joaquin
Parcel #
Numerous
State Highways
4
Schools
Discovery Bay Elementary
Waterways
Old River, N. Victoria Canal, Victoria Canal, Middle River, Italian Slough
Other Location Info
Victoria Island and Byron Tract
Notice of Determination
Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.