Thomas B. Shepard & Virginia G. Thomas Zone Change / Tentative Parcel Map (Z-04-09 / TPM-04-12)

2 Documents in Project

Summary

SCH Number
2005012022
Lead Agency
Siskiyou County
Document Title
Thomas B. Shepard & Virginia G. Thomas Zone Change / Tentative Parcel Map (Z-04-09 / TPM-04-12)
Document Type
NOD - Notice of Determination
Received
Posted
5/19/2005
Present Land Use
Developed and undeveloped. Z: Res-1 (Single Family Residential) and R-R-B-40 (Rural Residential Agricultural, 40 acre minimum parcel size). GP: Erosion Hazard Area and problems; Wildfire Hazard Area; Woodland Productivity; Severe Pressure Limitations Soils.
Document Description
The applicants propose a Zone Change for a 2.5 acre portion of 46 acres, located north of Deetz Road. The zone change is proposed to support the division of the 46-acre property creating one 2.5 acre parcel by changing the existing zoning from R-R-B-40 (Rural Residential with 40 acre minimum parcel size) to R-R-B-2.5 (Rural Residential with 2.5 acre minimum parcel size). No change in the zoning of the access and remainder are proposed; the parcels would remain zoned for R-R-B-40 and Res-1 uses. A Tentative Parcel Map (TPM-04-12) is concurrently proposed for the creation of the parcel and a remainder.

Contact Information

Name
Wayne Virag
Agency Name
Siskiyou County Planning Department
Contact Types
Lead/Public Agency

Location

Cities
Mount Shasta
Counties
Siskiyou
Zip
96067
Total Acres
46
Parcel #
021-500-170, 380; 021-271-600
Township
41N
Range
5W
Section
26
Base
MDBM

Notice of Determination

Approving Agency
Siskiyou County Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print