John Muir Medical Center Interim Uses
2 Documents in Project
Summary
SCH Number
2005012019
Lead Agency
City of Walnut Creek
Document Title
John Muir Medical Center Interim Uses
Document Type
NOD - Notice of Determination
Received
Posted
2/25/2005
Present Land Use
Hospital
Z: P-D2030
GP: HO (Hospital)
Document Description
A use permit for an interim site layout of the hospital campus, in order to anticipate both a future hospital expansion project and address current emergency room bed deficiencies. These interim uses would remain in place throughout the duration of the Phase 4 construction. The Interim Uses project includes the following actions:
1. In anticipation of its displacement by the Phase 4 parking garage, a temporary relocation of the existing helicopter pad from its current location east of the Phase 1 tower to a temporary landing platform to be constructed within the front parking lot.
2. The temporary placement of a 53' x 22' emergency room, mobile medical unit (trailer coach) near the entrance to the existing emergency room that will serve as an overflow facility.
3. In anticipation of the future parking garage footprint, a temporary relocation of the loading dock area from the south end to the north end of the existing hospital.
4. The removal of several trees in and around the helistop, gurney pathway and loading dock areas.
Contact Information
Name
Kenneth Nodder
Agency Name
City of Walnut Creek
Contact Types
Lead/Public Agency
Phone
Location
Cities
Walnut Creek
Counties
Contra Costa
Cross Streets
Ygnacio Valley Road / La Casa Via
Zip
94598
Total Acres
10
Parcel #
140-120-015
State Highways
I-680, Hwy 24
Schools
Mt. Diablo Unified
Other Location Info
1601 Ynacio Valley Road and 230 La Casa Via
Notice of Determination
Approving Agency
Planning Commission and City Council
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A