Imperial Plaza

2 Documents in Project

Summary

SCH Number
2005011106
Lead Agency
City of El Centro
Document Title
Imperial Plaza
Document Type
NOD - Notice of Determination
Received
Posted
7/11/2005
Present Land Use
Agriculture / Regional Airport (RAP) and General Commercial (CG) / General Commercial

Document Description
The proposed project consists of the development of 31.88 acres into 341,516 SF of General Commercial development, including 15 commercial lots, ranging in size from 0.83 acre to 13.52 acres along with 1,854 parking spaces. The project requires a Change of Zone of eastern 23 acres of the project site from Regional Airport (RAP) to General Commercial (CG). The proposed project is to be built in three phases. The timing of phasing will depend upon the demand for commercial space. Phase one is anticipated to accommodate 100,500 SF of building area, and 568 parking spaces. Phase two is projected to accommodate 169,000 SF of building area and 715 parking spaces. Phase three is projected to accommodate 72,016 SF and 571 parking spaces. These phases may vary depending upon demand.

Contact Information
Oliver M. Alvarado
City of El Centro
Lead/Public Agency
1275 Main Street
El Centro, CA 92243

Phone : (760) 337-4547

Location

Cities
El Centro
Counties
Imperial
Cross Streets
Imperial Avenue / Central Drain / Cruickshank Drive / N. 12th Street
Zip
92243
Total Acres
31.88
Parcel #
044-22-25
Railways
UPRR
Airports
Imperial County Airport

Notice of Determination

Approving Agency
City of El Centro
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
City of El Centro

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.