Music Building Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2005011099
- Lead Agency
- University of California San Diego
- Document Title
- Music Building Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 5/20/2005
- Present Land Use
- Mixed use (academic / administrative)
- Document Description
- The proposed site for the facility is located in the University Center Campus Neighborhood. The exact site is bounded on the east by Russell Drive, the Gilman Parking Structure, and the Pepper Canyon Multi-Purpose Building, bounded on the west by the University Center Administrative Buildings, bounded on the north by Rupertus Drive, and bounded on the south by the Sixth College Provost Adminstration Complex. The Music Building is designed to provide approximately 85,500 gsf. The program includes Faculty Offices/Studios, Instruction Spaces, Practice Rooms, Ensemble Rehearsal Spaces, Recital Hall (to support academic program needs), Administrative Support, and Research Laboratory Space.
- Contact Information
-
Catherine Presmyk
University of California Planning Design & Construction
Lead/Public Agency
1111 Franklin Street, 6th Floor
Oakland, CA 94607-5200
Phone : (858) 534-3860
Location
- Cities
- La Jolla
- Counties
- San Diego
- Cross Streets
- Gilman Drive and Russell Lane
- Zip
- 92093
- Total Acres
- 1.25
- State Highways
- I-5, 805
- Railways
- NCTP Coaster, Amtrak
- Waterways
- Penasquitos Creek
- Township
- 15S
- Range
- 4W
- Base
- Del Mar
Notice of Determination
- Approving Agency
- University of California
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- University of California at San Diego Campus Planning 10280 Torrey Pines South, Suite 340 La Jolla, CA 92093-0965
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.