Lake Hodges Pedestrian/Bicycle Bridge

3 Documents in Project

Summary

SCH Number
2005011085
Lead Agency
San Dieguito River Park Joint Powers Authority
Document Title
Lake Hodges Pedestrian/Bicycle Bridge
Document Type
NOD - Notice of Determination
Received
Posted
9/11/2006
Present Land Use
Vacant / AR-1-1 Zoning / Open Space
Document Description
The operator proposes to alter the streambed of Lake Hodges, tributary to the San Dieguito River, tributary to the Pacific Ocean, to accommodate the Lake Hodges Pedestrian/Bicycle Bridge Project, a 990-foot long bridge with related trail connections for pedestrians and bicyclists across Lake Hodges. The bridge will be a stress ribbon type structure with two piers placed in the lake and concrete abutments at either end of the bridge. Construction includes installing a series of pre-cast concrete panels, strung on cable anchored into the two bridge abutments. The cables will be stressed with tension to support the bridge platform. The two piers beneath the platform will rest on footings made from pre-cast concrete piles fabricated off-site and positioned by a crane in the lake. Both bridge abutments will consist of below-grade, concrete base structures. The project impacts 0.77 acre of streambed (Streambed Alteration Agreement #1600-2004-0470-R5).

Contact Information

Name
Tamara Spear
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
W. Bernardo Drive / I-15
Zip
92025
Parcel #
272-111-06
State Highways
I-15
Waterways
Lake Hodges
Township
13S
Range
2W

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.