Campus Electrical Infrastructure Renewal Project Phase 2A/2B
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2005011043
- Lead Agency
- University of California, Santa Barbara
- Document Title
- Campus Electrical Infrastructure Renewal Project Phase 2A/2B
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 5/2/2005
- Present Land Use
- Academic Uses
- Document Description
- Phase 2 of the Electrical Infrastructure Plan would continue the conversion of the University's electrical distribution system to 12.47/kV as started under Phase 1. Phase 2 consists of two parts, 2A and 2B. Phase 2A will complete two new distribution circuits called Research North and Central Academic that were partially installed as part of Phase 1. A third circuit called Research South will also be added. Phase 2B will continue the building conversion scheduled for an electrical line called the Central Academic feeder. The last distribution circuit called Housing/Auxilliary will be installed and all remaining buildings on Campus will be converted to the new system under this phase.
- Contact Information
-
Shari Hammond
University of California, Santa Barbara
Lead/Public Agency
1325 Cheadle Hall 2032
Santa Barbara, CA 93106-2030
Phone : (805) 893-3796
Location
- Cities
- Goleta Santa Barbara
- Counties
- Santa Barbara
- Cross Streets
- Main Campus
- State Highways
- 217
- Airports
- Santa Barbara
- Waterways
- Campus Lagoon
Notice of Determination
- Approving Agency
- University of California, Santa Barbara
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Office of Campus Planning and Design, Cheadle Hall
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.