Menifee Lakes Recycled Water Pipeline

3 Documents in Project

Summary

SCH Number
2005011030
Lead Agency
Eastern Municipal Water District (EMWD)
Document Title
Menifee Lakes Recycled Water Pipeline
Document Type
NOD - Notice of Determination
Received
Posted
3/23/2005
Present Land Use
Residential, Open Space, Public Facilities, Commercial Retail / Sun City - Menifee Valley Area and Riverside County General Plans
Document Description
The proposed project consists of the construction of approximately 12,020 lineal feet of 18-inch diameter recycled water transmission pipeline. The pipeline will be placed along the east side of Menifee Road within the existing public right-of-way for approximately 7,870 lineal feet from the existing recycled pipeline north of Salt Creek to La Piedra Road, thence along the north side of La Piedra Road westerly within the public right-of-way for approximately 4,150 lineal feet to its termination point at Antelope Road. The installation of the pipeline section across the Salt Creek Channel will be constructed by either attaching the pipe to the existing bridge or directional bore under the channel with no disturbance to the channel itself.

Contact Information

Name
Karen Hackett
Agency Name
Eastern Municipal Water District
Contact Types
Lead/Public Agency

Location

Cities
Perris
Counties
Riverside
Cross Streets
Various
Zip
92584
Parcel #
Various
State Highways
215
Schools
Menifee USD
Waterways
Salt Creek Channel
Township
5S,6S
Range
3W
Section
1,2,35
Base
SBB&M
Other Information
Section: 36

Notice of Determination

Approving Agency
EMWD
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.