Expanded Initial Study for the Soquel High School Stadium Lights Installation

2 Documents in Project

Summary

SCH Number
2004122085
Lead Agency
Santa Cruz City School District
Document Title
Expanded Initial Study for the Soquel High School Stadium Lights Installation
Document Type
NOD - Notice of Determination
Received
Posted
2/18/2005
Present Land Use
GP: Urban Open Space, Public Facility Z: Public Facilities
Document Description
The project will retrofit the existing Soquel High School sports stadium with an eight-pole lighting system that will provide lighting for night football and soccer events. The lighting system will consist of eight pole-mounted assemblies. There will be four poles located on each side of the field, just outside of the track. Each pole is eighty feet high. Each assembly is an array of eight, full cut-off light fixtures, three with 1000 watt high pressure sodium lamps and five with 875 watt pulse start metal halide lamps. Each fixture is a boxy structure with an open bottom that encloses a reflector. Full cut-off lighting systems eliminate direct light above the plane of the fixture opening and greatly reduce off-site spill light.

Contact Information

Name
Richard Moss
Agency Name
Santa Cruz City School District
Contact Types
Lead/Public Agency

Location

Counties
Santa Cruz
Cross Streets
Porter Street / Old San Jose Road
Zip
95073
Parcel #
030-341-05
State Highways
1
Schools
Soquel High School
Other Location Info
City: Soquel

Notice of Determination

Approving Agency
Santa Cruz City School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A