Airfield Drainage Improvements at Santa Barbara Airport

3 Documents in Project

Summary

SCH Number
2004121153
Lead Agency
City of Santa Barbara
Document Title
Airfield Drainage Improvements at Santa Barbara Airport
Document Type
NOD - Notice of Determination
Received
Posted
3/2/2005
Present Land Use
Airport Facilities, Airport Approach and Operations, Coastal Overlay, and Goleta Slough Reserve zones. GP: Major Public and Insitutional
Document Description
The proposed project would improve drainage capacity to the Santa Barbara Airport airfield from 20 cfs to 49 cfs, which would in turn enhance safety for aircraft operations. The project would be constructed during the period of May 1, 2005 to September 1, 2005. Construction activities would include pipe removal and installation, storm drain outlet construction, dewatering, and temporary disturbance to approximately 139,705 sf of Airport Property - of which 4,644 sf would be Coastal Act wetlands and 900 sf would be U.S. Army Corps of Engineers wetlands. The existing storm drains are located about 24 to 60 inches below ground. The replacement pipes would be located at similar depths. The disturbed areas of the airfield would be allowed to revegetate through natural colonization by reseeding, depending on the location of disturbance. In addition, the project includes a 6:1 wetland restoration component for permanent impacts to 40 sf Coastal Commission and Army Corps wetlands.

Contact Information

Name
Sara Iza
Agency Name
City of Santa Barbara
Contact Types
Lead/Public Agency

Location

Cities
Santa Barbara
Counties
Santa Barbara
Cross Streets
Fairview / Los Carneros
Total Acres
3.19
Parcel #
073-450-003
State Highways
101
Railways
Amtrak
Airports
project site
Schools
UCSB, Kellogg School, Goleta Valley JHS
Waterways
Pacific Ocean, Goleta Slough

Notice of Determination

Approving Agency
City of Santa Barbara
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print