Aquifer Storage and Recovery (ASR) Project and Pure Water Monterey Groundwater Replenishment (PWM/GWR) Project Changes Related to Approval of the Hilby Avenue P
13 Documents in Project
Summary
SCH Number
2004121065
Lead Agency
Monterey Peninsula Water Management District
Document Title
Aquifer Storage and Recovery (ASR) Project and Pure Water Monterey Groundwater Replenishment (PWM/GWR) Project Changes Related to Approval of the Hilby Avenue P
Document Type
NOD - Notice of Determination
Received
Posted
6/28/2016
Present Land Use
Open Space on the Former Fort Ord
Low-Density Residential
Document Description
The CalAm WDS Permit Amendment #M16-01-L3 includes: 1) the Hilby Avenue Pump Station, 2) the Monterey Pipeline, and 3) the existing ASR Phase 1 and Phase 2 wells. Because of existing CalAm diversion, treatment, and distribution system constraints, the ASR project cannot take full advantage of existing water rights granted by the SWRCB to divert excess winter Carmel River flows. The Monterey Pipeline previously was approved by the Monterey Regional Water Pollution Control Agency (MRWPCA) as part of the PWM/GWR Project to resolve a pumping trough problem and enable Cal-Am to distribute the drinking water to be produced by the PWM/GWR Project to its customers. Under the current approvals by the Monterey Peninsula Water Management District (MPWMD), the Monterey Pipeline also will be used to convey excess water diverted from the Carmel River to the ASR injection sites. The Hilby Ave. Pump Station will provide the lift capacity to move water up from the Monterey Pipeline and deliver the water to the ASR injection sites. The Pump Station and pipeline do not increase the allowed diversion of Carmel River water previously approved by the SWRCB; the facilities simply enable the MPWMD and CalAm to divert more excess winter flows for injection than the current CalAm system provides.
Contact Information
Name
Larry Hampson
Agency Name
Monterey Peninsula Water Mgt. Dist.
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Carmel, Monterey, Seaside, Monterey, Seaside
Counties
Monterey
Cross Streets
General Jim Moore Boulevard and Eucalyptus Road
Zip
93940
Total Acres
10
Parcel #
N/A
State Highways
1,68,218
Railways
N/A
Airports
Monterey Penninsula
Schools
Fitch Middle School
Waterways
Pacific Ocean
Township
N/A
Range
N/A
Section
N/A
Base
Long. 36
Other Location Info
Former Fort Ord
Other Information
Base: Long. 36° 35' 00" and Lat. 121° 50' 00"
Notice of Determination
Approving Agency
Monterey Peninsula Water Mgt. Dist.
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes