Streambed Alteration Agreement No. 1600-2012-0024-R4 for the Carmel River Low Flow Fish Passage Maintenance.

11 Documents in Project

Summary

SCH Number
2004121065
Lead Agency
Monterey Peninsula Water Management District
Document Title
Streambed Alteration Agreement No. 1600-2012-0024-R4 for the Carmel River Low Flow Fish Passage Maintenance.
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the Project applicant, MPWMD. The Project consists of the modification of instream riffles in the Carmel River in during low flow conditions to facilitate the passage of migrating, adult steelhead (Oncorhynchus mykiss). The Project is limited to modification of up to 20 critical riffles per year, using hand tools, by digging a trench no more than 2 feet wide, 1-foot deep, and 10 feet long. Critical riffles are defined as those whose crests do not contain at least 3 contiguous feet of flow that is at least 0.6 feet deep. The work will only be completed between December 1 and June 1, when flows of the Carmel River are less than 75 cubic feet per second, as measured at the Highway 1 Bridge gage.

Contact Information
Robb Tibstra
CDFW Central Region
1234 East Shaw Avenue
Fresno, CA 93710

805-594-6116

Location

Cities
Seaside Monterey Carmel, Monterey, Seaside
Counties
Monterey
Cross Streets
General Jim Moore Boulevard and Eucalyptus Road
Zip
93940
Total Acres
10
Parcel #
N/A
State Highways
1,68,218
Railways
N/A
Airports
Monterey Penninsula
Schools
Fitch Middle School
Waterways
Pacific Ocean
Township
N/A
Range
N/A
Section
N/A
Base
Long. 36
Other Location Info
Former Fort Ord
Other Information
Base: Long. 36° 35' 00" and Lat. 121° 50' 00"

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
Monterey Peninsula Water Management Agency, 5 Harris Court, Bldg. G, Monterey, CA 93940 Contact: Henrietta Stern, 831-658-5621

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search