State Water Project Water Transfer and Infrastructure Improvements Project Initial Study/Mitigated Negative Declaration Addendum No. 1

8 Documents in Project

Summary

SCH Number
2004121049
Lead Agency
Crestline Lake Arrowhead Water Agency (CLAWA)
Document Title
State Water Project Water Transfer and Infrastructure Improvements Project Initial Study/Mitigated Negative Declaration Addendum No. 1
Document Type
NOD - Notice of Determination
Received
Posted
10/19/2016
Present Land Use
The project construction area is located in a mountainous region, predominantly characterized by recreational and residential land uses. Scattered residences are located to the north of Rim of the World Drive, along Burnt Mill Road, and along Crest Fern Drive. The proposed new tank site is located in an existing private residential community with residential and land uses adjacent to the site. Z: RS-14M (Single Residential) GP: RS-14M (Single Residential)
Document Description
In 2005, Lake Arrowhead Community Services District and Crestline-Lake Arrowhead Water Agency (CLAWA), as co-lead agencies, adopted MND for the State Water Project Water Transfer and Infrastructure Improvements Project. The Project included the one-time purchase of up to 10,000 acre-feet of State Water Project water by CLAWA from San Bernardino Valley Municipal Water District ("SBVMWD") for delivery to the District. The Project also included demolition of existing water storage tanks and associated structures, and facility improvements, including a new turnout, pipeline, and a one million gallon water storage tank. To facilitate the water transfer, the Project further included a 15-year agreement between the District and CLAWA to take delivery of the Purchased Water, in annual increments not to exceed 1,500 acre-feet, at CLAWA's State Water Project turnout in Lake Silverwood, and extension of the term as necessary until all of the water is delivered. The delivered Purchased Water would be taken from SBVMWD's Table A amount under the SWP. The Purchased Water would be used after treatment by CLAWA and delivery to the District. The District would pay CLAWA for the Purchased Water the District actually receives and for the use of CLAWA facilities the District actually utilizes. This Purchased Water was to be used by the District as a replacement water supply in lieu of water that otherwise would be withdrawn from Lake Arrowhead. The MND analyzed the purchase of up to 10,000 acre-feet of water from SBVMWD for the benefit of the District based on the non-binding Principles of Agreement for Crestline-Lake Arrowhead Water Agency to Purchase, Treat and Deliver Potable Water to Lake Arrowhead Community Services District approved by the District on June 22, 2004. The District subsequently requested that CLAWA only purchase up to 8,000 acre feet of water based on its predicted needs, as reflected in the Agreement and fully analyzed in the MND. After adjusting for storage and evaporative losses (5% of the water purchased), under the Agreement CLAWA would deliver 7,600 acre feet of water to the District. The District approved modifications to the Agreement to extend its term for an additional 15-year period in order to transfer the balance of the originally agreed upon 7,600 acre-feet of water to the District. The Project Changes do not include the construction of any facilities, as these have already been constructed as part of the Project and consists only of the extension of the time period within which the Purchased Water may be delivered by CLAWA to the District. The annual amount delivered would not exceed 1,500 acre-feet, as specified in the Agreement and analyzed in the MND, and would not exceed the previously agreed upon 7,600 total acre-feet of water.

Contact Information

Name
Roxanne Holmes
Agency Name
Lake Arrowhead Community Services District
Contact Types
Lead/Public Agency

Location

Counties
San Bernardino
Cross Streets
Rim of the World Drive / Burnt Mill Road / Crest Fern Drive
Zip
92352
Total Acres
1
Parcel #
0335-232-06 and Roadway Right-of-Way
State Highways
173, 18
Railways
None
Airports
None
Schools
Rim of the World HS
Waterways
Multiple
Township
N/A
Range
N/A
Section
N/A
Base
N/A
Other Location Info
Rim of the World Drive, Burnt Mill Road, and Crest Fern Drive

Notice of Determination

Approving Agency
Lake Arrowhead Water Agency
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print