The Platinum Triangle Subsequent Environmental impact report No. 332 and Associated Actions

28 Documents in Project

Summary

SCH Number
2004121045
Lead Agency
City of Anaheim
Document Title
The Platinum Triangle Subsequent Environmental impact report No. 332 and Associated Actions
Document Type
NOD - Notice of Determination
Received
Posted
11/1/2005
Present Land Use
Mixed Use, Industrial, Office High/Low, Institutional, Open Space and Railroad
Document Description
The proposed project consists of the following actions associated with The Platinum Triangle Master Land Use Plan: 1. Certification of Subsequent EIR No. 332 to serve as the primary environmental document for subsequent actions to implement the adopted Platinum Triangle Master Land Use Plan, the Platinum Triangle Mixed-Use (PTMU) Overlay Zone and The Platinum Triangle Standardized Development Agreement. Implementation is intended to include, but not be limited to, the approval of subdivision maps, grading permits, street improvement plans, final site plans, development agreements and other related actions, for properties located within The Platinum Triangle. Future developments that require additional discretionary review will utilize this document for CEQA purposes to the extent possible, consistent with Section 15162 of the CEQA Guidelines. This SEIR is also intended to provide the additional environmental documentation for proposed City-initiated amendments to the General Plan, The Platinum Triangle Master Land Use Plan, the PMTU Overlay Zone and the Standardized Platinum Triangle Development Agreement described below. 2. Approve the Water Supply Assessment for The Platinum Triangle, in accordance with Section 10910 of the California Water Code; 3. Approve General Plan Amendment No. 2004-00420 to amend the City of Anaheim General Plan Land Use and Circulation Elements as follows: (a) To amend the Land Use Element to redesignate a 3.21-acre property located at the southeast corner of Orangewood Avenue and Rampart Street and further identified as 2400 East Orangewood Avenue ("North Net Fire Training Center") from the Office-High to the Mixed-Use land use designation; and provide for an additional 325 dwelling units and up to 210,100 square feet of additional commercial square footage in The Platinum Triangle Mixed-Use land use designation. This amendment would increase the maximum overall residential density from 9,175 to 9,500 dwelling units and the maximum overall commercial density from 2,044,300 to 2,254,400 square feet. (b) To amend the Circulation Element to redesignate a portion of Cerritos Avenue between State College Boulevard and Douglass Road from a Primary Arterial Highway to a Secondary Arterial Highway and to provide for Gene Autry Way between State College Boulevard and Betmor Lane to be up to 115 feet in width. 4. Amend the Platinum Triangle Master Land Use Plan to incorporate the following: an adjustment to the boundaries of the mixed-use districts to include the North Net Fire Training Center site in the PTMU Overlay Zone Gateway District and add 325 units to said District (321 of said units would be designated for the North Net Fire Training Center site); a modification to the PTMU Overlay Zone commercial density to add 210,100 square feet of additional commercial square footage (190,100 square feet of this square footage would be designated for future required ground floor commercial uses on Market Street and Gene Autry Way in the Katella and Gene Autry Districts and 20,000 square feet for other commercial uses in the Katella District); and, additional technical refinements and clarifications, including, but not limited to, refinements to street cross-sections and density descriptions to reflect the above-noted changes; 5. Amend Chapter 18.20 (PTMU Overlay Zone) of Title 18 of the Anaheim Municipal Code relating to zoning and development standards (Zoning Code Amendment No. 2004-00036) to incorporate the following: an adjustment to the boundaries of the mixed-use districts to include the North Net Fire Training Center site in the PTMU Overlay Zone Gateway District and add 325 units to said District (321 of said units would be designated for the North Net Fire Training Center site); a modification to the PTMU Overlay Zone commercial density to add 210,100 square feet of additional commercial square footage (190,100 square feet of this square footage would be designated for future required ground floor commercial uses on Market Street and Gene Autry Way in the Katella and Gene Autry Districts and 20,000 square feet for other commercial uses in the Katella District); and additional technical refinements and clarifications, including, but not limited to, refinements to density descriptions to reflect the above-noted change and other City Code requirements; 6. Amend the form of The Platinum Triangle Standardized Development Agreement (Miscellaneous Case No. 2005-00114) to reflect mitigation measure requirements set forth in the Updated and Modified Mitigation Monitoring Program No. 106A, editorial refinements and updated fees; 7. Rescind, in-part, City Council Resolution No. 2004-180 to reclassify the North Net Fire Training Center site from the PR (Public Recreational) to the O-H (High Intensity Office) Zone (Miscellaneous Case No. 2005-00115) and approved Reclassification No. 2004-00134 to reclassify said site from the PR to the PR (PTMU) Zone.

Contact Information

Name
Linda Johnson
Agency Name
City of Anaheim
Contact Types
Lead/Public Agency

Location

Cities
Anaheim
Counties
Orange
Cross Streets
I-15 and SR-57 Freeways
Zip
92803
Total Acres
~ 820
Parcel #
Various
State Highways
I-15 and SR-57
Railways
MetroLink
Schools
Paul Revere Elementary School
Waterways
Santa Ana River

Notice of Determination

Approving Agency
City of Anaheim
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print