Class 2 Permit Mofication to Post-Closure Permit at Rocketdyne Santa Susana Field Laboratory, Areas II / NASA - Sampling and Analysis Plan

Summary

SCH Number
2004118433
Public Agency
Department of Toxic Substances Control
Document Title
Class 2 Permit Mofication to Post-Closure Permit at Rocketdyne Santa Susana Field Laboratory, Areas II / NASA - Sampling and Analysis Plan
Document Type
NOE - Notice of Exemption
Received
Posted
11/23/2004
Document Description
The permit modification adjusts the groundwater monitoring program for the closed surface impoundments, updates the groundwater sampling and analysis plan, and modifies the language in the post-closure permit. DTSC issued a Post-Closure Hazardous Waste Facility Permit for the post closure care of four closed surface impoundments on SSFL Area II in April 1995 that included groundwater monitoring programs. Monitoring of the closed surface impoundments under post closure care is necessary to comply with California regulations. The permit modification designates sampling locations, including existing wells and two new wells, to bring the monitoring program in compliance with current regulations. It also changes the frequency of sampling and expands the list of constituents to be sampled. The groundwater sampling and analysis plan (GWSAP) describes the procedures for taking groundwater samples and having them analyzed. The modification to the GWSAP makes the procedures consistent with other programs at SSFL and provides for better comparison and collection of site-wide data. The language of the post closure permits was also modified in several places to be consistent with changes made to the sampling and analysis plan.

Contact Information

Name
Stephen Baxter
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Counties
Ventura
Other Location Info
Unincorporated

Notice of Exemption

Exempt Status
Other
Type, Section or Code
Section 15061(b)(3)
Reasons for Exemption
1. The changes proposed constitute minor changes to the overall facility post closure and monitoring. Only two wells will be drilled. They will be installed in an area impacted by industrial use, closed surface impoundments, and amidst an extensive groundwater monitoring well field consisting of over 400 monitoring wells. Forty of the proposed wells already exist and are sampled as part of other groundwater monitoring programs.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print