Master Permit for Environment Enhancement Projects: CCC Water Quality Project (Lake or Streambed Alteration Agreement No. 1600-2016-0205-R3)

79 Documents in Project

Summary

SCH Number
2004112063
Lead Agency
Santa Cruz County
Document Title
Master Permit for Environment Enhancement Projects: CCC Water Quality Project (Lake or Streambed Alteration Agreement No. 1600-2016-0205-R3)
Document Type
NOD - Notice of Determination
Received
Posted
8/25/2016
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0205-R, pursuant to section 1602 of the Fish and Game Code to the project Applicant, County of Santa Cruz Parks, Open Space and Cultural Services. The project is limited to construction of an instream sediment basin, construction of a drainage swale, and road improvements as part of a property-wide sediment control project. The sediment basin will be 105 feet long by 70 feet wide and will collect agriculturally derived sediment from neighboring agricultural lands and will hold a maximum volume of 0.15 acre-feet. Road work will include approx. 90 feet of grading, rocking, and creating/modification of rolling dips within the existing road footprint. A 115 linear foot swale will be constructed adjacent to the road to direct the road drainage into the riparian area. During the construction of the swale, there will be minor impacts to native blackberry and willow species.

Contact Information

Name
Randi Adair
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Watsonville
Counties
Santa Cruz
Cross Streets
Countywide
Total Acres
N/A
Railways
SPRR
Airports
Watsonville
Schools
Countywide
Waterways
All

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.