Bonny Doon Ecological Reserve Erosion Control Project

80 Documents in Project

Summary

SCH Number
2004112063
Lead Agency
Santa Cruz County
Document Title
Bonny Doon Ecological Reserve Erosion Control Project
Document Type
NOD - Notice of Determination
Received
Posted
9/12/2011
Document Description
This project is under the Master Permit issued to the Santa Cruz County Resource Conservation District (RCD) to administer the Santa Cruz Countywide Permit Coordination Program, for small, environmentally beneficial projects in Santa Cruz County. The project is located at Reggiardo Creek within the ecological reserve, Assessor Parcel Numbers 063-091-09 and 063-091-11. Project activities include the removal of a failed culvert and installation of a rock riprap roadbed. A riprap cutoff wall will also be installed. The existing road surface will be lowered approximately four feet and gabion sized rock riprap will be placed on the rock ford. Seepage collection structures, consisting of geotextile fabric and graded drain rock, will be placed to capture and direct base flow away from the riprap structure and into the existing channel. Seventy live willow stakes will be planted to stabilize the margins between riprap channel banks and fill slopes The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement, Number 1600-2011-0181-R3, pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Resource Conservation District of Santa Cruz County.

Contact Information

Name
Karen Christensen
Agency Name
CA Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Capitola
Counties
Santa Cruz
Cross Streets
Countywide
Total Acres
N/A
Railways
SPRR
Airports
Watsonville
Schools
Countywide
Waterways
All
Other Location Info
Soquel

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print