Carrol Avenue Obstruction Removal Project

80 Documents in Project

Summary

SCH Number
2004112063
Lead Agency
Santa Cruz County
Document Title
Carrol Avenue Obstruction Removal Project
Document Type
NOD - Notice of Determination
Received
Posted
9/14/2009
Document Description
This Project would remove a concrete apron, a piece of concrete lip, and broken concrete piece, which is currently narrowing streamflow on Lompico Creek on Carrol Avenue off of Lompico Road in Zayante, Santa Cruz County. Removing ~2 cy of the concrete would allow the sandy, porous material which has built up behind the structure to flush out and facilitate unobstructed stream flow. If large equipment is used, 2 excavators will be staged on the bridge, one breaking up the concrete while the other lifts the pieces out and disposes them into a dump truck. Traffic control will be provided for the other lane of the bridge. If hand-held equipment os used, a rock saw or similar equipment will be used to break up the concrete. An excavator, dump truck, skid steer (Bob Cat), crane and loader will be used.

Contact Information

Name
Suzanne DeLeon
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Capitola
Counties
Santa Cruz
Cross Streets
Countywide
Total Acres
N/A
Railways
SPRR
Airports
Watsonville
Schools
Countywide
Waterways
All
Other Location Info
Soquel

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A