Line C - Church Street Drainage Realignment Project

2 Documents in Project

Summary

SCH Number
2004111096
Lead Agency
City of Highland
Document Title
Line C - Church Street Drainage Realignment Project
Document Type
NOD - Notice of Determination
Received
Posted
1/18/2005
Present Land Use
Vacant
Document Description
The Line C - Church Street Drainage Realignment Project includes the realignment and extension of an approximately 1,020-foot long open storm drain channel, located adjacent to Church Street, from Merris Street to Elder Creek, within the City of Highland, San Bernardino County. An existing shallow earthern swale occurs along the proposed alignment, which was historically used to convey flows to Elder Creek. Within the past several years, a small earthern berm was constructed in this swale, which diverts flows at a 90-degree angle into an open field. These flows cut a shallow channel at a 90-degree angle from the Line C ditch, and currently support some mixed riparian vegetation. The proposed project is intended to restore historic drainage patterns and redirect existing flows into Elder Creek to prevent flooding which could threaten public safety and adjacent property.

Contact Information

Name
Lawrence A. Mainez
Agency Name
City of Highland
Contact Types
Lead/Public Agency

Location

Cities
Highland
Counties
San Bernardino
Cross Streets
Church Street / Morris Street and Church Street / Abbey Way
Zip
92346
Total Acres
~2
Schools
Arroyo Verde Elementary School
Waterways
Elder Creek, Upper Santa Ana River Wash
Township
1S
Range
3W
Section
3&11
Base
Redlands

Notice of Determination

Approving Agency
City of Highland
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print