L38-536 Mountain View Avenue Pipelien Replacement; SAA 2013-0059-R4

14 Documents in Project

Summary

SCH Number
2004111084
Lead Agency
Tulare County
Document Title
L38-536 Mountain View Avenue Pipelien Replacement; SAA 2013-0059-R4
Document Type
NOD - Notice of Determination
Received
Posted
9/30/2013
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the Project applicant, Southern California Gas Company. The applicant proposes to conduct horizontal directional drilling in order to install a new 4-inch high pressure main pipeline (line 38-536). Horizontal directional drilling at each waterway crossing will consist of two (2) excavations, a receiving hole and an entrance pit. These pits will be located approximately 100 feet on either side of the water crossings. The horizontal directional drill will be a minimum of 10 feet below the bottom of the channel. A frac-out contingency plan and materials will be kept on the job site during all activities. At the conclusion of work, the directional drill locations will be restored to pre-existing contours and conditions.

Contact Information

Name
Kyle Stoner
Agency Name
California Department of Fish and Game, Central Region
Contact Types
Lead/Public Agency

Location

Cities
Dinuba
Counties
Fresno
Cross Streets
Avenue 416 from Bethel Avenue to Road 92
State Highways
99
Railways
Southern Pacific Railroad

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes