Cingular Wireless - Boulevard Telecommunications Facility, P 90-018W1, Log No. 90-21-003A

2 Documents in Project

Summary

SCH Number
2004109059
Lead Agency
San Diego County
Document Title
Cingular Wireless - Boulevard Telecommunications Facility, P 90-018W1, Log No. 90-21-003A
Document Type
NOD - Notice of Determination
Received
Posted
10/20/2004
Document Description
This is a request for a Modification to Major Use Permit 90-018, which originally authorized the location of a telecommunications facility for Pactel Cellular (now Verizon). The modification request is to authorize Cingular Wireless to co-locate to the existing lattice tower for a wireless telecommunication facility and to locate associated equipment cabinets on the subject property on Tierra Del Sol Road in the community of Boulevard. The Cingular Wireless facility will consist of eight panel antennas on the existing 96-foot high Verizon lattice tower. The antennas will be placed at a height of 78-feet, below the existing antennas. The proposal also includes an enclosed equipment shelter located within a lease area of 10-feet by 27-feet 4-inches. The lease area is located south and adjacent to the Verizon equipment shelter.

Contact Information

Name
Emery McCaffery
Agency Name
San Diego County Department of Planning and Land Use
Contact Types
Lead/Public Agency

Location

Counties
San Diego

Notice of Determination

Approving Agency
San Diego Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print