Dean and Paula Ott House

Summary

SCH Number
2004109019
Lead Agency
City of Atascadero
Document Title
Dean and Paula Ott House
Document Type
NOD - Notice of Determination
Received
Posted
10/1/2004
Document Description
The proposed project is located on an ephemeral drainage that tributaries to Atascadero Creek and is located on Baranco Road, northwest of Highway 41 in Atascadero. A road was graded parallel to the drainage to provide access to a future home site. Sediment and concrete washings entered the stream along this road. Additionally, an undersized culvert and drainage inlet installed at the home site was unable to accommodate heavy flows during winter of 2004, resulting in storm water flowing overland toward the drainage which caused a large portion of the bank to fail. The proposed project would repair the bank failure by removing sediment from the site and installing approximately 225 SF of rock slope protection (RSP) along the bank. The undersized culvert and drainage inlet would be replaced with a culvert not less than 18 inches diameter in order to accommodate flows during heavy storms. The outfall of the culvert would also be lined with approximately 120 SF of RSP to minimize erosion along the bank. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement Number 1600-2004-0612-3 pursuant to Section 1602 of the Fish and Game Code to the project operator, Mr. Dean Ott.

Contact Information

Name
Mike Hill
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Atascadero
Counties
San Luis Obispo

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print