Rincon Cell Site; ZAP03-016/Log No. 94-03-002B

Summary

SCH Number
2004109018
Lead Agency
San Diego County
Document Title
Rincon Cell Site; ZAP03-016/Log No. 94-03-002B
Document Type
NOD - Notice of Determination
Received
Posted
10/4/2004
Document Description
This project proposes to install and operate an unnamed telecommunications facility for Verizon Wireless to the already existing cellular facilities for U.S. Western Cellular and AT&T. The proposed expansion will include the installation of two, 10-foot vertical supporters to which antennas will be attached. The vertical support in the southwestern portion of this site will include 2 sectors to which 4 antennas will be mounted (2 to each sector). The vertical support in the southwestern portion of the site will include 1 sector to which 2 antennas will be mounted. The proposed antennas will be painted green to match the surrounding shrubs and trees. The associated 300 square-foot equipment area will be located near the southeastern base of the existing 40-foot water tank and behind the group of tress that provide visual screening. The equipment cabinets will be placed on a 9-foot by 16-foot concrete pad. A GPS antenna will be installed within the equipment area. A permanent generator placed on a 5-foot by 8-foot concrete pad will be located southeast of the equipment cabinets.

Contact Information

Name
Donna Beddow
Agency Name
San Diego County Department of Planning and Land Use
Contact Types
Lead/Public Agency

Location

Cities
Irvine
Counties
Orange

Notice of Determination

Approving Agency
San Diego County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print