RMC Pacific Materials Project EIR

5 Documents in Project

Summary

SCH Number
2004102005
Lead Agency
City of West Sacramento
Document Title
RMC Pacific Materials Project EIR
Document Type
NOD - Notice of Determination
Received
Posted
7/13/2006
Present Land Use
Unused; an office, metal building, pavement, and truck scale remain from a previous woodchipping operation once located on the project site. Z: Water Related Industrial (M-3) GP: Water Related Industrial
Document Description
The proposed project would include the construction and operation of a cement terminal, an aggregate terminal, and a ready mix concrete batch plant. These cement and aggregate materials would be imported via ship and rail facilities and transferred by conveyors to six 189-foot tall 10,000 ton cement storage silos and aggregate piles up to 50 feet in height. These materials would then be loaded into trucks or rail cars for distribution. The batch plant would receive cement and aggregates from the terminals to produce cement onsite that would then be delivered to area customers by truck. Transportation facilities would consist of a new rail car loading facility and ship dock. Additionally, the proposed project includes the acquisition of easements, use agreements, assignment and/or other documents to provide non-exclusive access over the riverfront parcel adjacent to 1501 South River Road owned by the California State Lands Commission and leased by RMC. The proposed project also includes the demolition of an existing cement terminal at 1501 South River Road in West Sacramento. No specific redevelopment of the existing terminal site is proposed.

Contact Information

Name
Jon Robinson
Agency Name
City of West Sacramento
Contact Types
Lead/Public Agency

Location

Cities
West Sacramento
Counties
Yolo
Cross Streets
Parkway / Seaport
Total Acres
27 +/-
Parcel #
67-053-12
Waterways
Port of Sacramento Deep Water Channel
Township
8N
Range
4E
Section
Unsect

Notice of Determination

Approving Agency
City of West Sacramento
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print