Ophir Water Treatment Plant (Lake or Streambed Alteration Agreement No. 1600-2016-0261-R2)

8 Documents in Project

Summary

SCH Number
2004102002
Lead Agency
Placer County Water Agency
Document Title
Ophir Water Treatment Plant (Lake or Streambed Alteration Agreement No. 1600-2016-0261-R2)
Document Type
NOD - Notice of Determination
Received
Posted
3/10/2017
Present Land Use
Various lands are located around the proposed WTP site and the pipeline alignments including industrial, commercial, and rural residential land uses.
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0261-R2, pursuant to section 1602 of the Fish and Game Code to the Project Applicant, Placer County Water Agency. The proposed project, which is associated with future development of the Ophir Water Treatment Plant and current maintenance activities at the existing Ophir Pump station, is limited to the following activities: 1. Widening an existing unpaved access road across a 3-foot wide seasonal drainage. The seasonal drainage connects to a riparian wetland/storm water detention basin, under the South Canal (via 18-inch culvert) and into a seasonal drainage that connects to Auburn Ravine. This activity will involve the placement of 0.006 acre of fill (0.005 acres of permanent and 0.001 acre of temporary fill, 92 linear feet) into the seasonal drainage and the removal of three trees (interior live oak, CA buckeye, non-native fig tree) ranging from 8-12 inches trunk diameter at breast height (DBH). 2. Installing a concrete swale, outfall structure, and associated rock slope protection within riparian wetland habitat (associated with a storm water detention basin). This activity will involve the placement fo 0.035 acre of permanent fill (55 linear feet) within a riparian wetland. The fill will consist of 15 cubic yards of rock, 80 cubic yards of soil, and 1 cubic yard of concrete. One arroyo willow with an 8-inch DBH will be removed.

Contact Information

Name
PAtrick Moeszinger
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Auburn
Counties
Placer
Cross Streets
Ophir Road / Taylor Road / Rock Springs Road
Zip
Various
Total Acres
N/A
Parcel #
Various
State Highways
I-80
Railways
UPRR
Airports
N/A
Schools
N/A
Waterways
South Canal, Boardman Canal, Dutch Ravine
Township
Variou
Range
Variou
Section
Variou
Base
Various
Other Location Info
Newcastle, Penryn

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print