Foothill Water Treatment Plant 3 MGD Capacity Modification Project
8 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2004102002
- Lead Agency
- Placer County Water Agency
- Document Title
- Foothill Water Treatment Plant 3 MGD Capacity Modification Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 1/6/2017
- Present Land Use
- Various lands are located around the proposed WTP site and the pipeline alignments including industrial, commercial, and rural residential land uses.
- Document Description
- PCWA is approving an addendum that addresses project modifications to the existing Foothill Water Treatment Plant. This addendum addresses Project modifications, which were evaluated as a 60 MGD expansion in the 1999 Foothill Water Treatment Plant Optimization Project Environmental Impact Report (1999 EIR). The Project as modified would increase the capacity of the plant from 60 million gallons per day to 63 MGD. This would consist of improving two process trains at Foothill Water Treatment Plant (WTP) which were installed in 1991. The improvements will replace the flocculation, sedimentation, and sludge handling systems and provide additional 3 MGD is intended to serve development in western Placer County with water from the PCWA's Foothill WTP in the interim period until the Ophir WTP is constructed. An EIR for the Ophir WTP, previously called the Foothill Phase II WTP and Pipeline project, was prepared in 2005. The 2005 EIR evaluated supplying treated water supply in accordance with its capital plan which evaluated long-term water supply demands for existing and future customers resulting from planned regional growth in western Placer County.
- Contact Information
-
Heather Trejo
Placer County Water Agency
P.O. Box 6570
Auburn, CA 95604
Phone : (530) 823-4886
Location
- Cities
- Auburn
- Counties
- Placer
- Cross Streets
- Ophir Road / Taylor Road / Rock Springs Road
- Zip
- Various
- Total Acres
- N/A
- Parcel #
- Various
- State Highways
- I-80
- Railways
- UPRR
- Airports
- N/A
- Schools
- N/A
- Waterways
- South Canal, Boardman Canal, Dutch Ravine
- Township
- Variou
- Range
- Variou
- Section
- Variou
- Base
- Various
- Other Location Info
- Newcastle, Penryn
Notice of Determination
- Approving Agency
- Placer County Water Agency
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 144 Ferguson Road, Auburn, CA 95603
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.