Foothill Water Treatment Plant 3 MGD Capacity Modification Project
8 Documents in Project
Summary
SCH Number
2004102002
Lead Agency
Placer County Water Agency
Document Title
Foothill Water Treatment Plant 3 MGD Capacity Modification Project
Document Type
NOD - Notice of Determination
Received
Posted
1/6/2017
Present Land Use
Various lands are located around the proposed WTP site and the pipeline alignments including industrial, commercial, and rural residential land uses.
Document Description
PCWA is approving an addendum that addresses project modifications to the existing Foothill Water Treatment Plant. This addendum addresses Project modifications, which were evaluated as a 60 MGD expansion in the 1999 Foothill Water Treatment Plant Optimization Project Environmental Impact Report (1999 EIR). The Project as modified would increase the capacity of the plant from 60 million gallons per day to 63 MGD. This would consist of improving two process trains at Foothill Water Treatment Plant (WTP) which were installed in 1991. The improvements will replace the flocculation, sedimentation, and sludge handling systems and provide additional 3 MGD is intended to serve development in western Placer County with water from the PCWA's Foothill WTP in the interim period until the Ophir WTP is constructed. An EIR for the Ophir WTP, previously called the Foothill Phase II WTP and Pipeline project, was prepared in 2005. The 2005 EIR evaluated supplying treated water supply in accordance with its capital plan which evaluated long-term water supply demands for existing and future customers resulting from planned regional growth in western Placer County.
Contact Information
Name
Heather Trejo
Agency Name
Placer County Water Agency
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Auburn
Counties
Placer
Cross Streets
Ophir Road / Taylor Road / Rock Springs Road
Zip
Various
Total Acres
N/A
Parcel #
Various
State Highways
I-80
Railways
UPRR
Airports
N/A
Schools
N/A
Waterways
South Canal, Boardman Canal, Dutch Ravine
Township
Variou
Range
Variou
Section
Variou
Base
Various
Other Location Info
Newcastle, Penryn
Notice of Determination
Approving Agency
Placer County Water Agency
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.