Foothill Phase II Water Treatment Plant and Pipeline

8 Documents in Project

Summary

SCH Number
2004102002
Lead Agency
Placer County Water Agency
Document Title
Foothill Phase II Water Treatment Plant and Pipeline
Document Type
NOD - Notice of Determination
Received
Posted
7/8/2005
Present Land Use
Various lands are located around the proposed WTP site and the pipeline alignments including industrial, commercial, and rural residential land uses.
Document Description
The proposed Foothill Phase II Water Treatment Plant and Pipelines Project will include the acquisition of temporary construction easements and permanent maintenance and facility easements across private property as well as the construction and operation of water pipelines and associated facilities. Specifically, the proposed project includes: - A new raw water intake pipeline (54 inch in diameter) connecting to the planned 54 inch pipeline at the south end of the Auburn Tunnel Pump Station No. 2 (ATPS II) transfer basin and extending to the proposed water treatment plant (WTP); - A new water treatment plant having a capacity of 30 million gallons per day (mgd), which will include an operations building, pretreatment facilities for turbidity and organics reduction, filtration facilities, a chemical building, associated chemical feed systems, on-site storage facilities, and solids handling facilities; - A new treated water transmission system near the intersection of Taylor Road and Rock Springs Road (referred to as Phase I). Phase II of the pipeline segment will convey treated water at a point near the intersection of Taylor and Callison Roads and continue west to a pipeline to be constructed by the City of Lincoln connecting the Sunset 10 mg water storage tanks and the new Lincoln Storage Tank farm; and - A new 12 inch treated water transmission pipeline will connect to the existing 18 inch treated water transmission pipeline 350 feet east of Lozanos Road and continue southwest to the existing Newcastle water transmission system situated in Taylor Road.

Contact Information

Name
Heather Trejo
Agency Name
Placer County Water Agency
Contact Types
Lead/Public Agency

Location

Cities
Auburn
Counties
Placer
Cross Streets
Ophir Road / Taylor Road / Rock Springs Road
Zip
Various
Total Acres
N/A
Parcel #
Various
State Highways
I-80
Railways
UPRR
Airports
N/A
Schools
N/A
Waterways
South Canal, Boardman Canal, Dutch Ravine
Township
Variou
Range
Variou
Section
Variou
Base
Various
Other Location Info
Newcastle, Penryn

Notice of Determination

Approving Agency
Placer County Water Agency
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print