Foothill Phase II Water Treatment Plant and Pipeline

8 Documents in Project

Summary

SCH Number
2004102002
Lead Agency
Placer County Water Agency
Document Title
Foothill Phase II Water Treatment Plant and Pipeline
Document Type
FIN - Final Document
Received
Present Land Use
Various lands are located around the proposed WTP site and the pipeline alignments including industrial, commercial, and rural residential land uses.
Document Description
Placer County Water Agency (PCWA) is the lead agency for the operation and review of a draft Environmental Impact Report (EIR) for the proposed Foothill Phase II Water Treatment Plant and Pipeline Project (proposed project). In response to significant regional growth and in accordance with PCWA's Water Systems Infrastructure Plan (WSIP), PCWA plans to augment exising water supplies with a new treated water supply. Facilities that are addressed in this EIR include: * A new raw water intake pipeline (54 inch) pipeline at the south end of the Auburn Tunnel Pump Station No. 2 (ATPS) transfer basin and the water treatment plant (WTP); * A new water treatment plant (30 million gallons per day [mgd]), which will include an administration/maintenance building, pretreatment facilities for turbidity and organics reduction, filtration system, a chemical building, associated chemical feed systems, on-site storage facilities, and solids handling facilities; * A new treated water delivery pipeline (ranging from 60 to 42 inches) that will connect the new WTP to PCWA's existing transmission system near the intersection of Taylor Road and Rock Springs Road (referred to as Phase I). Phase II of the pipeline segment will convey treated water at a point near the intersection of Taylor and Callison Roads and continue west to a pipeline to be constructed by the City of Lincoln connecting the Sunset 10 mg water storage tanks and the new Lincoln Storage Tank farm; and * A new 12 inch treated water delivery pipeline that will connect to an 18 inch pipeline 350 feet east of Lozanos Road and continue southwest to the existing Newcastle water transmission system situated in Taylor Road.

Contact Information

Name
Heather Trejo
Agency Name
Placer County Water Agency
Contact Types
Lead/Public Agency

Location

Cities
Auburn
Counties
Placer
Cross Streets
Ophir Road / Taylor Road / Rock Springs Road
Zip
Various
Total Acres
N/A
Parcel #
Various
State Highways
I-80
Railways
UPRR
Airports
N/A
Schools
N/A
Waterways
South Canal, Boardman Canal, Dutch Ravine
Township
Variou
Range
Variou
Section
Variou
Base
Various
Other Location Info
Newcastle, Penryn

Notice of Completion

Development Types
Water Facilities (Plant)(Type Water Treatment, MGD 30)
Local Actions
Water Treatment Plant
Project Issues
Agriculture and Forestry Resources, Air Quality, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print