Foothill Phase II Water Treatment Plant and Pipeline
8 Documents in Project
Summary
SCH Number
2004102002
Lead Agency
Placer County Water Agency
Document Title
Foothill Phase II Water Treatment Plant and Pipeline
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
Industrial, Commercial, and various others along the pipeline alignment.
Document Description
Placer County Water Agency (PCWA) is the lead agency for the operation and review of a draft Environmental Impact Report (EIR) for the proposed Foothill Phase II Water Treatment Plant and Pipeline Project (proposed project). In response to significant regional growth and in accordance with PCWA's Water Systems Infrastructure Plan (WSIP), PCWA plans to augment exising water supplies with a new treated water supply. Facilities that are addressed in this EIR include:
* A new raw water intake pipeline (54 inch) connecting the Auburn Tunnel Pump Station No. 2 (ATPS) transfer basin and the water treatment plant (WTP);
* A new water treatment plant (30 million gallons per day [mgd]), which will include an administration/maintenance building, pretreatment facilities for turbidity and organics reduction, filtration system, a chemical building, associated chemical feed systems, on-site storage facilities, and solids handling facilities;
* A new treated water delivery pipeline (ranging from 60 to 42 inches) that will connect the new WTP to an existing transmission system near the intersection of Taylor Road and Rock Springs Road. An additional pipeline segment will convey treated water at a point near the intersection of Taylor and Callison Roads and continue west to the City of Lincoln metering station and the Sunset 10 mgd water storage tanks; and
* A new 12 inch treated water delivery pipeline that will begin near the Interstate 80 park-n-ride lot and continue southwest to the existing Newcastle system in Taylor Road.
Contact Information
Name
Heather Trejo
Agency Name
Placer County Water Agency
Contact Types
Lead/Public Agency
Phone
Location
Cities
Auburn
Counties
Placer
Cross Streets
Ophir Road / Taylor Road / Rock Springs Road
Zip
Various
Total Acres
N/A
Parcel #
Various
State Highways
I-80
Railways
UPRR
Airports
N/A
Schools
N/A
Waterways
South Canal, Boardman Canal, Dutch Ravine
Township
Variou
Range
Variou
Section
Variou
Base
Various
Other Location Info
Newcastle
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Health Care Services (DHCS), California Department of Parks and Recreation, California Department of Transportation, District 3 (DOT), California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB), Department of Toxic Substances Control, Department of Water Resources, Office of Historic Preservation, Resources Agency, State Water Resources Control Board, Division of Loans and Grants, State Water Resources Control Board, Division of Water Rights, California Highway Patrol
State Reviewing Agency Comments
California Highway Patrol
Development Types
Water Facilities (Plant)(Type Water Treatment, MGD 30)
Local Actions
Water Treatment Plant
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Wetland/Riparian, Wildfire, Wildlife
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.