The proposed project will consist of the following components: 1. Installation of up to two water tanks with a total capacity of up to 8 million gallons. Each tank will be approximately 150 feet in diameter and up to approximately 30 feet in height (up to 15 feet may be buried). 2. Stockpiling od up to 120,000 cubic yards of soil in an open area located immediately west of the proposed tank site, along the Brinton Road easement, and/or at the Banning Wastewater Treatment Plant. 3. Installation of a 30-inch diameter pipeline from the proposed tank(s) to the intersection of Wilson Street and 16th Street (approximately 7,700 feet in length), including acquistion of a 15-foot wide easement along Brinton Road. 4. Installation of a 20-inch diameter diameter pipleline within Sunset Avenue from Wilson Street to Westward Avenue (approximately 6,000 feet in length). The new pipeline will connect to an existing 18-inch diameter pipeline located along Westward Avenue.

Contact Information
Nicole Sauviat Criste
City of Banning
90 E. Ramsey Street
Banning, CA 92220-0998

(951) 922-3125

Location

Cities
Banning
Counties
Riverside
Cross Streets
Wilson Street / Brinton Road
Zip
92220
Total Acres
7
Parcel #
Various
State Highways
10, 243, and 79
Railways
UPRR
Airports
Banning Municipal
Schools
Calvary Christian School / Monte Vista School
Waterways
Montgomery Creek, Smith Creek
Township
2N
Range
1E
Section
6
Base
SBMB

Notice of Determination

Approving Agency
City of Banning
Approving Agency Role
Lead Agency
Final EIR Available Location
City of Banning 99 E. Ramsey Banning, CA 92220

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
N/A