Kelly Corporate Center GPA/ZC - GPA 04-09/ZC 04-05/LCPA 04-08
3 Documents in Project
Summary
SCH Number
2004101078
Lead Agency
City of Carlsbad
Document Title
Kelly Corporate Center GPA/ZC - GPA 04-09/ZC 04-05/LCPA 04-08
Document Type
NOD - Notice of Determination
Received
Posted
2/22/2005
Present Land Use
Industrial (Professional Office Buildings) and Open Space/Planned Industrial/Planned Industrial
Document Description
Request for a Negative Declaration, General Plan Amendment, Zone Change, and Local Coastal Program Amendment to change the Residential Medium Density (RM) and Planned Development (PI) General Plan land use designations to Open Space and to change the Residential Density-Multiple with a Qualified Development Overlay (RD-M-Q) and Planned Industrial (PM) zoning designations to Open Space on 9.5 acres of property within the Kelly Corporate Center industrial subdivision. The amendments are to designate properties as open space that are constrained by topography, biological resources, and previously encumbered by open space easements through previous discretionary approvals (SDP 97-25). The properties are remnant parcels from previous development approvals which are being General Plan and Zoned as Open Space for mapping consistency.
Contact Information
Name
Van Lynch
Agency Name
City of Carlsbad
Contact Types
Lead/Public Agency
Phone
Location
Cities
Carlsbad
Counties
San Diego
Cross Streets
Palomar Airport Road and Hidden Valley
Total Acres
25.28
Parcel #
212-040-66, -67, -70
State Highways
I-5
Railways
NCTD
Airports
McClellan/Palomar
Schools
Hidden Valley Elementary
Waterways
Pacific Ocean
Notice of Determination
Approving Agency
City of Carlsbad
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.