Rose Bowl Stadium Renovation Project

6 Documents in Project

Summary

SCH Number
2004101073
Lead Agency
City of Pasadena
Document Title
Rose Bowl Stadium Renovation Project
Document Type
NOD - Notice of Determination
Received
Posted
6/10/2008
Present Land Use
Open Space
Document Description
The replacement of all seating in the Rose Bowl is a project priority. While some seats in the Bowl would be removed to accommodate the project renovations, club seating would be increased and would offset the removed seating. Thus, the existing seating capacity of 92,000 would remain relatively unchanged by the proposed project. The existing suites and press box structure would be removed and replaced with a new three level structure on the west side of the stadium to include one club level and two levels of suites and press facilities. A lighted, animated ribbon sign would be attached on the interior-facing façade of each level of the press box. The proposed project would include demolition of existing ancillary structures around the base of the stadium as well as the perimeter structures at the fence line, along the with removal of asphalt surfacing and landscaping. Most importantly, emergency exiting from the stadium would be improved by one of three options.

Contact Information

Name
Erin Clark
Agency Name
City of Pasadena
Contact Types
Lead/Public Agency

Location

Cities
Pasadena
Counties
Los Angeles
Cross Streets
Arroyo Boulevard and Rosemont Avenue
Zip
91103
Parcel #
5702-001-901
State Highways
210, 134, 2, 110
Railways
MTA Gold Line

Notice of Determination

Approving Agency
City of Pasadena
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print