Stadium Wetland Mitigation Project for the Master Storm Water System Maintenance Program
16 Documents in Project
Summary
SCH Number
2004101032
Lead Agency
City of San Diego
Document Title
Stadium Wetland Mitigation Project for the Master Storm Water System Maintenance Program
Document Type
NOD - Notice of Determination
Received
Posted
9/2/2015
Present Land Use
Public Land, Public Right-of-Way; Storm drainage facilities
Document Description
CDFW is intending to execute a lake and streambed alteration agreement pursuant to section 1602 of the fish and game code (1600-2014-0192-R5) to the project applicant, City of San Diego - Public Utilities Department. Project activities within the approximately 57-acre site include: rehabilitation of approximately 20.8 acres of riparian habitat through the removal of heavy infestations or monocultures of target invasive species; improvement of topographic complexity, and planting of native riparian species; enhancement of approximately 32.2 acres of riparian and freshwater marsh habitat through the removal of target species in areas that contain predominantly native plant species and augmentation with the application of native hydroseed mix; and removal of target invasive species and application of native hydroseed within 2.9 acres of access and utility easements. Exotics removal methods include application of herbicide, cutting and removing biomass, mowing, clearing and grubbing, grading, and excavation. Secondary channels will be contoured to include haul out locations appropriate for local reptiles and amphibians.
Contact Information
Name
Kelly Fisher
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Cities
San Diego
Counties
San Diego
Regions
Citywide
Cross Streets
several
State Highways
Hwy 52, 163, 15, 805, I-5
Railways
AT&SF, Amtrak
Airports
San Diego Int'l,Montgomery Field
Schools
multiple
Waterways
San Diego River, SD Bay, Mission Bay, Tijuana River
Other Information
Airports: Browns Field
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.