Sabrina Dam Repair

Summary

SCH Number
2004098417
Public Agency
Fish & Game #7
Document Title
Sabrina Dam Repair
Document Type
NOE - Notice of Exemption
Received
Posted
9/27/2004
Document Description
Drain Sabrina reservoir; construct temporary diversion; remove existing grizzlies; attach new intake/grizzly structures to existing concrete footing, making repairs as necessary; install trashracks; remove existing riprap diversion wall, dig footings, install steel reinforcement, and construct concrete form; pour footings and wall; remove all leftover construction materials and debris; return lake level.

Contact Information

Name
Dwane Becker
Agency Name
Department of Fish and Game, Region 7
Contact Types
Lead/Public Agency

Location

Cities
Bishop
Counties
Inyo

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
sec 15301, class 1
Reasons for Exemption
Class one exemptions include repairing existing facilities used to provide electric power, which describes this project.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print